Download a printable boiler commissioning work record for England, Wales. The PDF contains the record sections shown below and writing space for the actual findings.

Download the blank printable PDF for free.

Free blank Boiler commissioning work record form

Print the blank record and keep the completed copy with the job. The preview shows the actual blank download.

Blank Gas boiler commissioning checklist form

PDF

First page of the Gas boiler commissioning checklist PDF rendered by Tradehand

Record scope and contents

England, Wales. The appropriately registered and competent commissioning person for the boiler and fuel.

  • Record details: Record reference, Commissioning date, Jurisdiction, Fuel
  • External notification attachment: Regulation 44 notice path, Building-control notification state, External issuer as recorded, External issuer reference, Returned certificate attachment identifier
  • Registered business: Registered business name, Registered business address, Registered business postcode, Registered business telephone, Business Gas Safe no.
  • Installation: Installation address, Installation postcode, Site contact name
  • Boiler identity: Boiler make, Boiler model, Boiler serial number, Hot-water controls, Controls and interlock
  • Boiler Plus (England combination boilers): Weather compensation, Load compensation, Smart thermostat, Flue-gas heat recovery
  • Controls fitted: Zone valves, Thermostatic radiator valves, Automatic bypass, Underfloor heating
  • Central heating readings: Central heating gas rate, Gas rate unit, Burner operating pressure, Dynamic gas inlet pressure, Central heating flow temperature, Central heating return temperature, System balanced
  • Combination boiler readings: Hard-water area, Domestic hot-water gas rate, Cold-water inlet temperature, Hot-water temperature, Hot water at outlets
  • Combustion: Maximum rate CO, Maximum rate CO2, Maximum rate CO/CO2 ratio, Minimum rate CO, Minimum rate CO2, Flue integrity check completed
  • Water quality and condensate: System flushed and cleaned, System cleaner used, Inhibitor used, Primary water filter, Condensate drain fitted, Condensate termination
  • Handover: Controls demonstrated, Literature left, Person present
  • Engineer: Engineer name, Licence number, Engineer signature, Date signed

Primary source for this record · checked 2 October 2026

What the Boiler commissioning work record covers

Record installation and commissioning findings, the boiler, measurements, settings, sign-off and handover evidence. Attach the actual manufacturer or Benchmark commissioning document when required. This work record is separate from that branded document and from building notification.

Who needs one

  • The appropriately registered and competent commissioning person for the boiler and fuel.
  • Record scope: England, Wales.
  • Keep the completed record with the source documents, findings and job reference.