What the electrical installation certificate covers
An EIC records the design, construction, inspection and testing of new electrical work against BS 7671: a new installation, a new circuit or a consumer unit replacement. It includes the circuit details, test results and responsible person's declarations. Building Regulations notification is a separate process where required; issuing an EIC does not complete that notification.
Who needs one
- Electricians completing a new installation, a new circuit or a consumer unit (fuse board) replacement
- Work requiring an EIC, with the applicable Building Regulations notification arranged separately
- Handing proof of safe, compliant work to a homeowner, landlord or main contractor
- Keeping your own record for a competent-person scheme notification
Choose the document for the work
Use an EIC for a new installation, a new circuit or a consumer unit replacement. Minor Works records an addition or alteration to an existing circuit without a new circuit. An EICR records inspection of an existing installation; it does not replace the EIC for new work. The IET publishes the model forms at IET model forms.
The free blank PDF below has six pages. Page 1 contains client/scope and supply details; page 2 installation particulars; page 3 inspections, departures and the recommended interval; page 4 circuit details; page 5 test results; and page 6 the combined declaration. Use the completed certificate with its schedules as one handover record.
Client and scope: identify exactly what is covered
Start with the certificate number, client name/address, installation address and completion date. The client address and installation address can differ. Record the installation type, description and extent covered by the certificate so the customer can identify the work.
Fictional record example: the client address is an office, while the work is a new circuit at a different property. The description and extent identify that new circuit and the installation address. This is a paperwork example; no test values or declaration have been invented. The responsible electrician supplies those from the actual work.
Supply and installation: use the actual installation evidence
The supply section records the earthing arrangement, conductor configuration, nominal voltage/frequency, prospective fault current, external earth fault loop impedance and supply protective device. It also records whether other sources of supply are present and their details. Copy verified particulars and measured results from the actual work, with the correct units.
The installation particulars cover maximum demand, means of earthing, conductor and bonding details and the main switch/RCD particulars. Identify the relevant equipment from the installation record. A scope description or a previous customer's certificate is not evidence for these fields.
Inspections, circuit details and test results must stay connected
Complete the inspection schedule from the actual inspection and record comments on the existing installation. Declare relevant departures or permitted exceptions and the recommended next inspection interval in the appropriate fields. The responsible electrician decides and supports those entries.
The circuit-details schedule includes the distribution-board reference/location, circuit number and description, wiring/conductor particulars and protective-device details. The test schedule uses the circuit number to connect each result to that circuit. Keep the identifiers consistent across both schedules.
The test-results header records the instruments and calibration information. The rows provide continuity, insulation resistance, polarity, earth fault loop impedance, RCD and other applicable results, plus remarks. Record actual results and explain relevant missing evidence rather than filling an empty field with an assumed pass. This walkthrough explains the record; the responsible competent person performs and evaluates the inspection and testing.
Who signs this EIC?
Tradehand's EIC uses one combined signature for design, construction, inspection and testing. The signatory takes responsibility for all four parts of the work described. Enter the name, company/on-behalf-of details, address, contact details, relevant registration particulars, position, signature and date.
Where different people hold those responsibilities, choose the appropriate multi-signature model form instead. A customer accepting a quote is not signing this technical declaration. Qualification, competence and scheme membership are established through their respective routes, not by creating an account or issuing a blank form.
Arrange notification before notifiable work
For notifiable work under Part P in England, the IET describes self-certification by a registered competent person, registered third-party certification or building control. Choose the applicable route before starting. The EIC and the Building Regulations compliance or completion document are separate records. See IET Part P certification routes.
Hand over the certificate and keep the job evidence
Give the person ordering the work the completed, signed EIC with the inspection and circuit/test schedules, and retain a copy. Keep the agreed scope, variations and supporting work evidence with the job. Retain the separate building compliance/notification record where required; an EIC does not submit that notification.
Before handover, check the addresses and extent, consistent circuit references, actual results, declared departures and the signer's responsibility. The first-job pack connects those documents to scope and agreement: First paid job and handover pack. For the qualification route and evidence questions, use Electrician qualification routes and evidence.
More free certificates.

Electrical
Electrical Installation Condition Report
Full BS 7671 condition report: circuits, test results, C1–C3 & FI codes, Satisfactory/Unsatisfactory outcome.

Electrical
Minor Electrical Installation Works Certificate
Certify additions and alterations to existing circuits: the lightweight BS 7671 counterpart to an EIC.

Electrical
EV Charge-Point Installation Certificate
Certify EV charger installs: charger detail, open-PEN and RCD protection, commissioning tests, BS 7671.
Questions sole traders ask
When do I issue an EIC instead of a Minor Works Certificate?
Issue an EIC for a new installation, a new circuit or a consumer unit change. Use a Minor Electrical Installation Works Certificate for an addition or alteration to an existing circuit that does not include a new circuit: for example adding a socket to an existing ring.
Is the EIC software free?
Yes. No monthly fee, no per-certificate charge and no expiring trial. You can issue unlimited certificates free. Free includes the manual tools and the Assistant with £1 of usage a month: 5% of each payment Tradehand takes, card fees included. Paid plans from £25 a month add automation and more usage. Basic payment fees on your own jobs: From 1.25% + 20p, deducted automatically when the customer pays. Grow and Advanced have lower Tradehand payment fees.
Does it follow the BS 7671 model form?
The certificate uses the BS 7671:2018+A4:2026 model EIC structure: installation and supply particulars, inspection and circuit/test schedules, and one combined declaration for design, construction, inspection and testing. Use the appropriate multi-signature form when different people hold those responsibilities.
Can the customer sign the technical declaration?
The technical declaration is signed by the person responsible for design, construction, inspection and testing. Customer quote approval and receipt of the handover are separate from that responsibility.