New Roof Needed With Solar Panels On It

New Roof Needed With Solar Panels On It

Not sure? We'll check for you.

Short answer: the panels are taken off, the roofer does the roof and the solar installer refits and tests the system. Agree who does what and in which order before anyone starts.

Low

Blake FolgadoUpdated

What's happening?

A solar array sits on brackets fixed through the roof covering, so a new roof or a repair under it means taking the panels and their mounting off and putting them back afterwards. That is two trades. An electrician or solar installer has to disconnect and reconnect the system: the Planning Portal, quoting the HSE, says electrical connection work must be done by a qualified electrician. A roofer then re-covers the roof. The Planning Portal also says that building regulations normally apply to fitting solar panels and that the roof's ability to carry the load has to be checked and proven, so a roof that is being replaced is the point at which strengthening can be done. This page is about the planned job. If the roof started to leak after the panels went on, the leak page covers it.

What usually causes it?

  • A roof covering, felt or battens that have reached the end of their life under the array
  • Slipped, cracked or missing tiles or slates found when the array is inspected
  • Roof timbers or decking that need repair before the roof is re-covered
  • Failed flashings or penetrations around the mounting brackets or cable entry
  • A planned re-roof the owner wants done before the panels reach the end of their own life, so the roof is not disturbed twice
  • Storm or leak damage to the roof that has to be put right under the array

Is it dangerous?

The risk is in the work, not the waiting. Panels generate electricity whenever there is daylight, so nobody should unclip or move them without the system isolated by a qualified person. Roof work is work at height: the Planning Portal's HSE guidance says scaffolding is usually required on a roof. Do not take panels off yourself, and do not let a roofer lift them without a solar installer.

Can I fix it myself?

Before anyone is booked, find the solar paperwork: the installer's name, the MCS certificate and the warranties on the panels and the roof penetrations. Photograph the array and the roof from the ground. Ask the solar installer whether panel removal affects any warranty. Do not walk on the roof, do not pull the isolators, and do not unclip a panel to look underneath.

When should you call a renewable energy installer?

Call the solar installer, ideally the original one, to plan the removal and refit, and call the roofer to scope the roof. Choose a solar installer who is MCS certified, as MCS says it sets the standard for how small-scale renewables should be installed, and a roofer who is an NFRC member with a written quote and guarantee. Ask them to agree the sequence, the scaffold and who is responsible if a panel or bracket is damaged.

What will the renewable energy installer actually do?

  • Survey the roof and the array and agree the scope, the scaffold and the order of work
  • Isolate and disconnect the system, then remove the panels and their mounting
  • Agree the order of work with the roofer and take the array down before they start
  • Check the new roof and mounting points before refitting the array
  • Refit the mounting and panels, sealing and flashing every penetration through the new covering
  • Reconnect, test and recommission the system, and update the paperwork

Who fixes this

  • Solar panel removal

Questions people ask

What happens to my solar panels when I need a new roof?

They are isolated, taken off with their mounting, and refitted after the new roof is on. A solar installer does the electrical disconnection and refit, and a roofer does the roof. The order and the scaffold are agreed first.

Can a roofer remove my solar panels?

Not on their own. The Planning Portal, quoting the HSE, says electrical connection work must be done by a qualified electrician. A roofer should work with a solar installer or electrician who isolates and disconnects the system.

Do I need building regulations approval to refit solar panels on a new roof?

The Planning Portal says building regulations normally apply when solar panels go on a roof, and the roof's ability to carry the load has to be checked and proven. Your solar installer or building control can say what applies to your job.

Should I replace the roof before fitting solar panels?

If the roof covering is near the end of its life, doing the roof first avoids taking the array off later. A roofer or solar installer can say whether the covering will outlast the panels.

Sources & References

  1. Planning Portal: Building regulations, solar panels
  2. Planning Portal: Getting your job done safely, solar panels (HSE)
  3. MCS: Consumers
  4. NFRC: Choosing a roofing contractor